January 24, 2022 Committee of the Whole
WWTP Upgrades_Update and Next Steps_PGraham_FINAL
Attachment #1 – Tech Memo_Flows and Loads Update
Attachment #2 – Class D Cost Estimates for Proposed WWTP Upgrades
Attachment #3 – Pre-design Drawings for Proposed WWTP Upgrades
Attachment #4 – Expected Growth in Snug Cove Sewer Area
Attachment #5 – Proposed Property Aquisition for Phase 2 WWTP Expansion
Attachment #6 – CoW presentation_WWTP Upgrades_Jan24,2022
January 31, 2022 Special Council Meeting
220131_WWTP Phase 1 Upgrades Update and Next Steps PGraham_FINAL
Attachment #1 – Expected Growth to be Accommodated by WWTP Upgrades
Attachment #2 – 60% Design Drawings_Phase 1 WWTP Upgrades
Attachment #3 – Draft RFP for Construction Management_Phase 1 WWTP Upgrades
Attachment #4 – 2022-01-28 Equalization Tank Size Update – Final
March 14, 2022 Regular Council Meeting
220314_SCSLAS WWTP Upgrade Financing Options Report_KWatson_FINAL
March 28, 2022 Regular Council Meeting
220328_Options for Attribution to Sewer Local Service Area_KWatson_FINAL
April 25, 2022 Regular Council Meeting